top of page
IMG_2652.JPG

IMP MINE PIT SITE B

OPERATIONS PLANNING

HOME > OPERATIONS > OPERATIONS PLANNING

IMP MINE PLAN 

IMP has created a mine plan for Site B, which is a 1 km long vein zone featuring two veins with a projected 1.9 million metric tons of ore.  Current assays from a 2,500 metric ton sample shipment acquired from the mine (see Operations Activities video), indicate metal content is likely in the range of 25% of combined Lead and Zinc.  This single pit will thus be sufficient Ore to meet the 1.7 million metric ton requirement for the first three years of Concentrate sales operations plus the first year of Smelter operations.  See Drilling for information about the three other identified vein zones and the surface potential of the Anomaly, which combined resource estimate is around 12 million metric tons of Ore.

CONCEPTUAL MINE PLAN.png

PLANNING FOCUS

IMP has developed comprehensive planning for three key areas of activity:

I.   Exploring (borehole drilling and analysis) the IMP concession resource with JORC compliant methodology

II.  Developing the infrastructure for mining and concentrate production at the mine 

III.  Building a co-located Lead Smelting & Purification Plant and Zinc Smelting & Purification Plant

bottom of page