PRODUCTS
Lead & Zinc Ore Flotation Process
HOME > ABOUT US > PRODUCTS
IMP will begin selling three grades of Lead and Zinc Ore in Q3 of 2024, limiting ore sales based on pricing and risk control objectives.
ORE SALES
GRADE 1: Is a semi-beneficiated ore averaging 15% metal content of Lead and Zinc, sold in powdered form having around 35% Lead and 65% Zinc metal ratio.
GRADE 2: Averages 5% metal content or above with around 35% Lead and 65% Zinc metal ratio, sold as a rough crushed lump.
All payments will be based on actual quantities as measured during delivery of the Ore to the stockpile by the Buyer and Seller under an agreed Surveyor. The quantities of metal in the Ore for price setting are based on the Certificate of Analysis generated by the Surveyor under standard terms. Ore is provided in Lump Form, but can be crushed for an additional charge.
FUTURE CONCENTRATE SALES
IMP MINERALS will begin producing Concentrates (combined Lead and Zinc) by Q4 2023.
ZINC CONCENTRATE: 51% to 54% Metal Content
LEAD CONCENTRATE: 56% to 60% Metal Content